Our offer
Our activities include: preparation of project documentation, gathering of required equipment, measurement devices and drivers, producing of prefabricates and semi-profiles...
Always actual
Work is carried out taking into account current trends, using modern techniques, using special equipment, necessary facilities and equipment recognized companies.
Green Energy
Renewable energy - new activity of ENAP
References
-
Sirius Engineers Sp. z o.o. – Delivery, prefabrication and assembly of measurement cubicles for exhaust flue gas desulfurization installation IOS II, recipient Kozienice Powerplant
-
Zakłady Azotowe Puławy SA – Works regarding measuring industry of the modernization task of the manufacturing oxygenition-ammonia-urea facility
-
Elektrobudowa SA - Assembly of control cables and electrica works for bl. 858MW, PGE Bełchatów Powerplant
-
Kozienice Powerplant SA – Modernization od DCS automation at block 7
-
Institute of Power Systems Automation Sp. z o. o. - "The work of disassembly and assembly of the wiring and equipment on the block No. 7 in Kozienice SA
-
ZA Puławy SA - "Installation of heating pipes to the task of rebuilding a node discharge of benzene and cyclohexanone"
-
Stalowa Wola SA power plant Tauron Group - "Modernization of the Water Treatment Plant - measurement and automation instrumentation for the industry"
-
Power Plant SA - "Repair Station próbopobieraków on Block No. 10"
-
Elektrobudowa SA - "Installation of electric heating in PTA plant in the construction of installations for the production of Terephthalic Acid in Anwil Wloclawek"
-
JTC SA - "Implementation of the instrumentation assembly Wet FGD Siekierki Power Plant - Stage I
-
Preci Poland - "Implementation of cable routes for the construction of weights in Kozienice"
-
Energoautomatyka Sp. z o. o. - "Dismantling the installation of instrumentation for the task Modernization of Control and Supervision Unit No. 6 at PGE Power Station
-
PSE East - "Implementation of repairing the facade, roof and drainage compressor building in SE 220/100kV Zamość"
-
ENVAG - "Implementation of cable connecting the container with the data points to analyze the gases in Kozienice"
-
Procom System SA - "The installation of the control room to the task of modernization carburizing (the node 31, 32, 33), PGE Power Station
-
Elektrobudowa SA - Electrical and I&C forks for etoxylation installations in Płock aranged for PCC Rokita”
-
APS Energy SA – „ Electrical works PGE Opole Powerplan”
- Stalowa Wola Power Plant Tauron Group - Work performance of I&C systems in scope of boiler OP150,K11 adoption for burning an excessive amount of biomass.
- Instytut Automatyki I Systemów Energetycznych Sp. z o.o. - Modernizing turbine dynamic control tuning for Unit no.8, Kozienice Power Plant
- Instytut Automatyki Systemów Energetycznych Sp. z o.o. – „Modernizing technological protection for Unit no.8, Kozienice Power Plant
- Clyde Bergemann Poland Sp. z o.o. – „Implementation of communication between ash blowing cabinet and DCS system, Kozienice Power Plant
- Energoautomatyka Sp. z o.o. – „Assembly of I&C systems for task Control System Modernization and Supervision Unit no.4 in BOT Bełchatów Power Plant
- Kozienice SA Power Plant - Modernization of automation systems of Block No. 8 (basic and group sequence in DCS Ovation) in object part of the facilities and modernization of crossroom Block No. 8
- Wratislavia-Bio Sp. z.o.o. - Electrical and I&C forks for Desmet Ballestrém installations to catalyst reduction in Biodiesel Production Plant Bio-Wratislavia Sp. z.o.o.
- ELPAK Sp. z.o.o. - The implementation of works and supply of I&C associated with the project of Tz-12 turbine delivery to the combined heat and power station Zeran along with the design and associated works. I&C industry. "
- Power Kozienice SA - Overhaul of water sampling station for Unit No. 8
- Power Kozienice SA - The renovation works of units 8x200MW, 2x500MW and blockout facilities
- Elektra K.I.A.E.iP. - Electric assembly works at EC Wrocław Port City
- Elektroaparatura Sp. z.o.o. - Assembly work of electrical installation in the HM Głogów"
- Institute of Power Systems Automation Sp. z.o.o. - Modernization of the dynamic control system of the turbine state (special measurements) Block No. 9 of the Power Kozienice
- Power Kozienice SA - Overhaul of water sampling station for Unit No. 9
- Pulawy Nitrogen Works SA - Works regarding measuring industry of the modernization task of the manufacturing oxygenition-ammonia-urea facility
- APS Energia Sp. z.o.o. - Construction works, installation of air conditioning and cable for ODM and RCN PSE-South SA"
- Power Kozienice SA - Replacing cables on the DC power supply block of the I&C control room No. 5 and 6
- Polimex Mostostal S.A - Performance of documentations, supply, accomplishment of assembly, after assembly tests, commissioning, implementation of the warranty service in terms of I&C systems - Implementation of the installation of electricity generation from renewable energy sources ( biomass ) in Białystok Combined Heat and Power Plant .
- Instytut Automatyki I Systemów Energetycznych Sp. z o.o. - Apparatus and cabling assembly - Modernizing turbine dynamic control tuning for Unit no.6 , Kozienice Power Plant
- Kozienice Power Plant S.A - Overhaul of I&C systems for Unit no.5, 6, and 10 as well as common auxiliaries
- . Kozienice Power Plant S.A - Overhaul of I&C system for Unit no.5
- Emerson Process Management Power and Water Solution Sp.z o.o. - Assembly of flue gas opacity meter before exhaust gas purification installation - Ostrołęka Power Plant Group.
- I&C Energa AS - Assembly of I&C systems for Unit no.8 Electrenai Power Plant Lithuania.
- Kozienice Power Plant S.A - Modernizing of unit DCS. DCS sequence group of OVATION system for Unit no.6 in scope of unit auxiliaries.
- Energomontaż - Północ S.A - Assembly I&C components for biomass belt conveyors in Białystok Combined Heat and Power Plant .
- Kozienice Power Plant S.A - Overhaul of water sampling station for Unit no.6
- Schneider Electric Polska Sp. z o.o. - Assembly of closed loop control cubicles with entrusted elements for OS Piaseczno.
- APS Energia Sp. z o.o. - Performance of converters cables connections for Świnoujście Navy Port.
- APS Energia Sp. z o.o. - Performance of 220 V DC Power plant general electrical auxiliaries with two electrical power suppliers PB220/100MS with entrusted materials.
- Emerson Process Management Power and Water Solution Sp.z o.o. - Assembly of OVATION system as well as delivery and field installation of I&C elements - modernizing of gas oil firing warm-up burner for Kozienice Power Plant Unit no.5
- Elektra K.I.A.E.iP. - Remaking of 0,4kV substation fields in Kawęczyn Combined Heat and Power Plant.
- Stalowa Wola Power Plant Tauron Group - Work performance of I&C systems in scope of boiler OP150,K11 adoption for burning an excessive amount of biomass.
- Kozienice Power Plant S.A - Overhaul of water sampling station for Unit no.4
- Energoster Sp. z o.o. - Assembly of I&C electrical parts for Kozienice Power Plant Unit no.5
- Kozienice Power Plant S.A - Assembly of control and fibre optical cables in 400kV channel duct . Connection between 200MW Units and Central Electrical Control Room.
- Polimex Mostostal S.A - Implementation of works in the electro- energy and technical industry, as well as electrical heating for "Building of Chemical Sulphate Production Plant - PCC Rokita Brzeg Dolny"
- Kozienice Power Plant S.A -Unit no.3 - overhaul of water sampling station
- Kozienice Power Plant S.A - I& C overhaul as well as auxiliary systems for Unit no. 1, 2,3, 7,8
- Emerson Process Management Power and Water Solution Sp.z o.o.-Preparing and carrying out the work for modernizing of I&C and measurement systems on Unit no.3 Karlshamnverket Sweden
- I&C Energo AS - Assembly of I&C systems - unit no.7 Elektrenai Lithuania
- Polimex Mostostal S.A - Installation of I&C systems for production section. Delivery and assembly for warehouse of Building no.1 together with Profibus and fibre optical cables lay out for Methyl - Ester Acid Plant in "Wratislavia - Bio" Sp. z o.o.
- Akwawit - Brasco S.A - Technical assistance for Desmet Ballaster during commissioning in Methyl - Ester Acid Plant in "Wratislavia - Bio" Sp. z o.o.
- Energoautomatyka Sp. z o.o. - Assembly of I&C elements - modernizing of control and supervision systems for BOT Bełchatów Power Plant Unit no.3
- Puławy Nitrogen Plant - Modernizing of Sulfuric Acid and Oleum installation.
- Instal Kraków S.A - Assembly of electrical and I&C systems - modernizing of flue gas inlet to chimney no.1, flue gas channels of unit no.2 and 3 together with inlet connection to chimney no.2 in Kozienice Power Plant.
- Kozienice Power Plant S.A - Overhaul of I&C system for Unit no.1
- Instal Kraków S.A - Assembly works of electrical and I&C systems for the subject of refurbishment of cooling system of air compressor station no.1 (compressor TS04 ) based on air forced cooler system with automatic oil temperature control of air compressor TS04 in Kozienice Power Plant.
- Kozienice Power Plant S.A - Overhaul of digital control systems of Unit no.1. DCS WDPF system - field side.
- Kozienice Power Plant S.A - Overhaul of I&C systems for cogeneration porpose.
- Emerson Process Management AG - Switzerland - "Delivery and assembly of I & C of Unit No.3 REK BITOWA - Macedonia"
- Emerson Process Management Power and Water Solutions Sp. z o.o. - "I/O object test checkout of steam and gas turbine of Unit No 1"- Thermal Power Plant IMANTA Latvia
- Puławy S.A Nitrogen Plant - "Perform a measurement trade work for a task of Melamine Recycling Section ( MRS )"
- Emerson Process Management Power and Water Solutions Sp. z o.o. "Replacement of armored capillary tubing thermometers and perform turbine leak-off rack installations- turbine - generator set Tz - A , Żerań Thermal Power Plant
- "Zdzieszowice" Sp. z o.o. Coking Plant - "Temperature measurements of riser pipes of battery no.11"
- Puławy S.A Nitrogen Plant - "Perform a measurement trade work for a task of purchase and assembly of PO2 pumps for acid circulation inside the absorption column KO1"
- "Kozienice" S.A Power Plant - "Modernization of air cooling installation of flame control system of light oil burners of steam boiler no.K9 ( 1650 t/h ) "
- "Kozienice" Power Plant SA - "Complex modernization of I&C systems of power units no.1, 2, 3, 4, 6, 9 and common auxiliaries"
- Elektrobudowa SA - "Delivery, assembly, and start up of I & C installation, task: �odernization of smoke conduit no.2 - "Kozienice" Power Plant SA "
- Instytut Automatyki Systemów Energetycznych - "Assembly of measuring apparatus and local and external cabling for turbine supervisory measurements of power unit no.4 -"Kozienice" S.A Power Plant "
- Elektrobudowa SA - "Delivery, assembly and set in motion of I & C installations . Task: Modernization of forced air water cooling towers located in "Kozienice" S.A Power Plant "
- "Kozienice" S.A Power Plant - " Water Cooling Pumps -Perform an automatic change over to self-lubrication "
- Polimex Mostostal Siedlce - "Cabling assembly for fitting by-pass of hot outgoing district heat water and steam. Introduce into system 12 operating condition signals of UPS for new turbine - generator set Tz-A - "Żerań Thermal Power Plant"
- Emerson Process Management Power and Water Solutions Sp. z o.o. - "Diagnostics and faults remove from I&C systems .Object: turbine - generator Tz-A technological system and degassers installation - Żerań Thermal Power Plant "
- Procom System SA - "Assembly and disassembly work concerning a task: Replacement of compressor control system, object: Cooper Turbo - compressor TA - 48 located in compressor house in Department of ash removal - BOT Turow S.A Power Plant. "
- "Kozienice" S.A Power Plant - "Assembly of air control installation for boiler AP-1650 safety valves"
- "Kozienice" S.A Power Plant - "Overhaul of water sampling system of power unit no 2"
- "Kozienice" S.A Power Plant - "Overhaul of I & C boiler protection systems connected with exhaust flue gas desulfurization installation IOS II of power units no.2 and 4"
- "Kozienice" S.A Power Plant - "Overhaul of I & C systems of power unit no 9"
- Zakłady Remontowe Energetyki Lublin S.A. - Zakład Kozienice - "Modernization of electrical and I & C systems. Make a furnishing of additional coolers located in compressor house no.2 "Kozienice" S.A Power Plant
- Elektrownia Kozienice SA - "Supply of control devices indirect heating systems of power unit no.9 safety valves."
- I&C Energo AS - "Cabling arrangements and connections - Elektrenai Power Plant Lithuania �
- Impact Automotive Technologies Sp. z o.o. - "Carry out assembly work of Battery-packs according to the given documentation."
- Elektra KIAEiP - "Assembly of optical fibers in "Kozienice" S.A Power Plant."
- Elektroaparatura Sp. z o.o. -"Assembly of I & C installations in Wielbark IKEA Sawmill"
- Elektrownia Kozienice SA - "Perform measurement of electric quantities of unit auxiliaries switch houses P and K sections A and B for �active island �purpose."
- Elektrobudowa SA - "Perform of I & C work. Task: Gypsum transport system from IOS II to the main gypsum store located in " Kozienice" S.A Power Plant."
- Emerson Process Management Power and Water Solutions Sp. z o.o - "Delivery and assembly of whole I & C systems of turbine-generator set Tz-A� Thermal Power Plant - Żerań Poland
- Mostostal Pulawy S.A - Development of fluid gases reloading terminal for TEZEZ Sp. z o.o I & C systems.
- Power Industry Overhaul Factories Lublin S.A - Kozienice Factory - Modernization of electrical and I & C systems of Demineralization Station II located in " Kozienice�S.A Power Plant .
- "Kozienice�S.A Power Plant - Overhaul of I & C systems of power units no 2,4( 200MW)
- "Kozienice�S.A Power Plant - "I & C modernization connected with reduction of technical minimum to Pmin=110 MW in range of object parts works.
- "Kozienice�S.A Power Plant - "Overhaul of I & C systems of power units no:1, 7, 8, 9, 10 as well as auxiliary objects�
- Kingspan Sp. z o.o - " Replace and development of existing automatic control systems operated on store of raw materials for productions "
- Emerson Process Management Power and Water Solutions Sp. z o.o - Complex modernization of I & C systems of power units no.8 ( 200MW ) "Kozienice�S.A Power Plant
- SICK Sp. z o.o - Delivery, prefabrication and assembly of measurement cubicles for exhaust flue gas desulfurization installation IOS II, recipient "Kozienice�S.A Power Plant .
- Pulawy Nitrogen Plant S.A. - Assembly of measurement systems. Object: Industrial water filtrate systems of Adela cooling installation.
- Remak Rozruch S.A - Finishing and complete works of I & C systems. Szamotuły Gas Press Sampling Station.
- "Stalowa Wola�S.A Power Plant - Modernization of measurements, I & C systems. Control of steam pressure of turbine bleed no.1 system, and amount of deminaralized water to steam condenser of TG no.6
- "Kozienice�S.A Power Plant - Modernization of DCS OVATION control desk and measurements cubicles of power unit no.8
- "Kozienice�S.A Power Plant - Overhaul of water sampling system of power unit no.5
- SICK Sp. z o.o - Delivery and assembly of junction boxes with overvoltage protectors for exhaust flue gas desulfurization installation IOS II. "Kozienice�S.A Power Plant
- "Kozienice�S.A Power Plant -Overhaul of WDPF system control cubicle of power unit n8
- Emerson Process Management Power and Water Solutions Sp. z o.o. - "Modernizacja AKPiA bloku Nr 5 i 6" w Elektrowni Kozienice SA
- Elektrownia Stalowa Wola SA - "Modernizacja układów pomiarowych sterowania i automatyki branży AKPiA w celu dostosowania układu ciepłowniczego do potrzeb zintegrowanej regulacji EL. II"
- Elektrim Megadex SA - Dostawa i montaż części akpia dla części przyturbinowej dla zadania "Modernizacja turbozespołu TG6 w Elektrowni Stalowa Wola"
- Elektrownia Stalowa Wola SA - "Modernizacja układów pomiarowych sterowania I automatyki branża akpia kotłów K-10 i K-11"
- Instytut Automatyki Systemów Energetycznych - "Montaż aparatury i okablowania na bloku nr 5 w Elektrowni Kozienice SA w zakresie Elektrohydraulicznego układu regulacji i sterowania oraz pomiarów specjalnych turbiny"
- Elektrownia Kozienice SA - "Remont stacji próbopobieraków na bloku nr 5"
- SICK Sp. z o.o. - Wykonanie prefabrykatów i wierceń w kominie dla zadania "Opomiarowanie emisji spalin w EC Stomil Olsztyn"
- Przedsiębiorstwo Pomiarów i Automatyki "PiA-ZAP" - Montaż i dostawa materiałów branży AKP na zadaniu inwestycyjnym "Modernizacja i intensyfikacja Instalacji Melaminy I" - Etap I w Zakładach Azotowych Puławy SA
- Elektrownia Kozienice SA - "Modernizacja centralnej sygnalizacji bloku nr 5"
- SICK Sp. z o.o. - Wykonanie prefabrykatów i wierceń w kominie dla zadania "Opomiarowanie emisji spalin w PESC Częstochowa SA"
- Siltec Sp. z o.o. - "Wykonanie pomiarów instalacji energetycznej w obiekcie HP Polska"
- Elektrownia Kozienice SA - "Remont AKPiA bloków 1 10 oraz obiektów poza blokowych"
- Hewlett-Packard Polska Sp. z o.o. -"Prace modernizacyjne Rozdzielni Głównej w Nowym Sękocinie"
- Elektrownia Stalowa Wola SA - "Modernizacja układów pomiarowych sterowania i automatyki branży AKPiA kotłów K8 i K9"
- Procom-System SA (na zlecenie Simens Niemcy) - "Układanie kabli i łączenie w szafach w EC Wilno"
- Elektrownia Kozienice SA - "Modernizacja palników gazowych blok nr 3 z dostosowaniem ich do istniejących palników olejowych"
- Polska Telefonia Cyfrowa Sp. z o.o. - "Budowa wewnętrznych linii zasilających w 20907 - zasilanie siłowni nr 2"
- Zakładach Azotowych Puławy SA - "Montaż układów pomiarowych, Obiekt: Węzeł filtracji roztworu mocznika D-115A"
- Zakładach Azotowych Puławy SA - "Montaż okablowania urządzeń AKPiA Wytwórnia Melaminy III. Chłodnie Wentylatorowe"
- Elektrownia Kozienice SA - "Modernizacja AKPiA związana z obniżeniem minimum technicznego bloków nr: 2, 6, 7 do Pmin=110MW w zakresie wykonawstwa części obiektowej"
- Elektrownia Kozienice SA - "Modernizacja AKPiA obrębie pomiarów i sterowań kotła związanych z wymianą zaworów wtryskowych i rozruchowych na bloku nr 1"
- ICS Polska Sp. z o.o. - "Instalacje elektryczne i AKPiA dla systemu podajników w Elektrociepłowni Firmy Black Red & White w Biłgoraju"
- Firma Handlowo-Usługowa "Margo" - "Instalacje elektryczne w budowanym Zakładzie Konfekcjonowania Drobiu w miejscowości Garbatka Długa"
- Polska Telefonia Cyfrowa Sp. z o.o. - "Przygotowanie instalacji zasilającej dla platformy IN6"
- Techmatrans SA - "Prace montażowe instalacji elektrycznych na budowie Volkswagen Poznań"
- Elektrownia Kozienice SA - "Remont AKPiA bloków 1 10 oraz obiektów poza blokowych"
- Elektrownia Kozienice SA - "Wymiana rur impulsowych na pomiarach podciśnienia i różnicy podciśnienia w komorze paleniskowej kotła bloku nr 10"
- APS Energia Sp. z o.o. - "Wykonanie prac montażowych na stacji "Karolinka" RE Piotrków Trybunalski"
- Elektrownia Kozienice SA - "Oznakowanie na bloku nr 2 kabli automatyki i pomiarów turbiny i kotła oraz kabli sterowniczych napędów 6 kV, 0,4 kV na kotle"
User login
Contact
ENAP S.A. Wilczkowice Górne 20b
26-900 Kozienice
phone/fax +48 48 614 14 76
e-mail: enap@enap.pl
NIP: 812-17-75-885
Regon: 672754945 ----------------------------------------------------------
Wyświetl większą mapę ----------------------------------------------------------
